Craig Simpson, secretary manager of the East Columbia Basin Irrigation District, inside the EL 47.5 pump house.

Stories this photo appears in:

EL 47.5 builds on promise of the Columbia Basin Project
July 13, 2021 1 a.m.

EL 47.5 builds on promise of the Columbia Basin Project

WARDEN — The six pumps in the EL 47.5 pump house can pull 63,100 gallons of water each minute out of the East Low Canal.