Nate Andreini, assistant manager for technical services for the East Columbia Basin Irrigation District, in front of the switch box and control panel that runs the EL 47.5 pump house.
June 7, 2021
Stories this photo appears in:
July 13, 2021 1 a.m.
EL 47.5 builds on promise of the Columbia Basin Project
WARDEN — The six pumps in the EL 47.5 pump house can pull 63,100 gallons of water each minute out of the East Low Canal.